This project involved construction of the Phase 3 expansion to include expansion and modification to such items as the influent pump station, new grit chamber, primary clarifier, aeration basins, blower building, return sludge pump station, recycled water pump station, secondary clarifier, equalization basin and chemical feed facility.
The existing facility was kept in operation during construction.
< Back to Previous Page |
|